IX-BR50 Breeder Cage System Specifications, Operation & Selection Guide
A breeder cage system is configured for parent-stock management with controlled feed, water, housing access and project-specific automation.

What is IX-BR50?
IX-BR50 is an IXORTA breeder cage system. A breeder cage system is configured for parent-stock management with controlled feed, water, housing access and project-specific automation. Its principal catalogue values are Section dimensions: 2700 × 1200 × 820 mm; Catalogue movement area: 648 cm².
Start with the IXORTA Poultry & Feed product range, then use this model page to assess fit, operating needs and the information required for a quotation.
Modular Technical Data & Specs
IX-BR50 catalogue specifications
The values below come from the supplied 2026 IXORTA catalogue.
IX-BR50 catalogue specifications
The values below come from the supplied 2026 IXORTA catalogue.
The values below come from the supplied 2026 IXORTA catalogue. Use them to build an initial shortlist, then confirm the exact configuration, options and acceptance criteria in the model-specific quotation.
| Section dimensions | 2700 × 1200 × 820 mm |
|---|---|
| Catalogue movement area | 648 cm² |
| Birds per section | 45 |
| Automation | Project-configured |
Before ordering: confirm the duty, usable capacity, overall dimensions, utilities, safety package, controls, attachments and documentation for the destination market. Download the division catalogue.
Capacity Fit & Range Comparison
Where IX-BR50 sits in the range
IX-BR50 is the first configuration in a 2-model range; buyers should compare it with the larger listed alternatives when...
Where IX-BR50 sits in the range
IX-BR50 is the first configuration in a 2-model range; buyers should compare it with the larger listed alternatives when...
IX-BR50 is the first configuration in a 2-model range; buyers should compare it with the larger listed alternatives when production or work-envelope needs may grow.
Shortlist this model when the planned duty is close to its listed values. If the application regularly approaches a limit, compare the adjacent models below and ask IXORTA to check working margin, cycle expectations and future capacity.
Operating Mechanics & Automation
How the IX-BR50 works
Bird placement, sex ratio, feed allocation, water and lighting are managed to the breeder programme.
How the IX-BR50 works
Bird placement, sex ratio, feed allocation, water and lighting are managed to the breeder programme.
Bird placement, sex ratio, feed allocation, water and lighting are managed to the breeder programme. Equipment timing and access are coordinated with egg handling, manure removal and house climate.
The safe sequence depends on the supplied guards, controls, utilities and attachments. Operators should follow the delivered manual, training and site risk assessment. For process examples and planning articles, continue to the IXORTA Poultry & Feed industry guides.
Factory Acceptance & Quality Standards
Manufacturing and acceptance checks
Review cage dimensions, wire and frames, feed-control interfaces, drinking lines, doors, egg and manure systems where sp...
Manufacturing and acceptance checks
Review cage dimensions, wire and frames, feed-control interfaces, drinking lines, doors, egg and manure systems where sp...
Review cage dimensions, wire and frames, feed-control interfaces, drinking lines, doors, egg and manure systems where specified, drives and a full project sequence test.
A useful factory-acceptance record identifies the agreed configuration, principal components, inspection points, test material or load, observed results, open actions, documentation set, packing method and release approval. See IXORTA Poultry & Feed project scopes for the wider delivery context.
Engineering Selection Criteria
Applications and selection questions
A catalogue capacity alone is not enough.
Applications and selection questions
A catalogue capacity alone is not enough.
Typical applications
- parent-stock farms
- breeder management
- hatching-egg projects
- project-specific poultry houses
Confirm before selection
- breeder programme and bird count
- house dimensions
- feed-allocation method
- egg collection
- automation level
- climate and service access
A catalogue capacity alone is not enough. IXORTA should receive the normal and peak operating range, site conditions, utilities, operator experience, destination and delivery constraints before recommending a configuration. Review the division buyer FAQs before sending the enquiry.
Practical Working Sequence
Practical working sequence
Use the project enquiry form to identify any required training, commissioning or operator documentation.
Practical working sequence
Use the project enquiry form to identify any required training, commissioning or operator documentation.
- Define the job. Record material, load, output, quality and environmental requirements.
- Inspect before start. Check guards, fluids, fasteners, tooling or attachments, connections and the work area.
- Set the equipment. Apply the model manual, verified program or calibrated field setting.
- Prove at low risk. Run a dry cycle, first part, clean-water test or short field pass as appropriate.
- Monitor production. Watch load, sound, temperature, quality, flow, alignment and safety devices.
- Close and record. Isolate safely, clean, inspect wear and log service actions.
Use the project enquiry form to identify any required training, commissioning or operator documentation.
Preventive Care & Service Schedule
Maintenance priorities
Intervals depend on operating hours, duty, dust, heat, water quality and the surrounding environment.
Maintenance priorities
Intervals depend on operating hours, duty, dust, heat, water quality and the surrounding environment.
- inspect access doors and wire surfaces
- calibrate feed delivery
- flush drinker lines
- service egg and manure systems where installed
Intervals depend on operating hours, duty, dust, heat, water quality and the surrounding environment. The delivered manual and component schedules control the final service plan. Send spare-parts and service questions through the IXORTA contact page.
Export & Hot-Climate Project Planning
Project planning for Saudi Arabia, the UAE, Iraq and hot-climate markets
Confirm bird type and age, house dimensions, summer design temperature, power and water reliability, ventilation duty, f...
Project planning for Saudi Arabia, the UAE, Iraq and hot-climate markets
Confirm bird type and age, house dimensions, summer design temperature, power and water reliability, ventilation duty, f...
Confirm bird type and age, house dimensions, summer design temperature, power and water reliability, ventilation duty, feed storage, emergency operation, automation level, biosecurity, inland route and installation responsibilities.
For a useful export quotation, include the destination port, inland route, unloading equipment, site access, local standards, document language, commissioning responsibility and critical spare-parts expectation. Browse regional project examples.
Request a IX-BR50 quotation
Send the intended application, capacity, destination and site conditions. The request is routed to the IXORTA team with this division and model already identified.
Frequently Asked Questions about IX-BR50
Direct engineering answers on durability, climate adaptation, maintenance, and factory delivery from IXORTA in Konya, Türkiye.
1. What is the IX-BR50 Breeder Cage System used for?
A breeder cage system is configured for parent-stock management with controlled feed, water, housing access and project-specific automation. Typical applications include parent-stock farms, breeder management, hatching-egg projects, project-specific poultry houses.
2. How does the IX-BR50 work?
Bird placement, sex ratio, feed allocation, water and lighting are managed to the breeder programme. Equipment timing and access are coordinated with egg handling, manure removal and house climate.
3. What are the catalogue specifications for IX-BR50?
Section dimensions is 2700 × 1200 × 820 mm; Catalogue movement area is 648 cm²; Birds per section is 45; Automation is Project-configured. These are catalogue-listed reference values and must be confirmed in the final quotation.
4. What information should a buyer send for a IX-BR50 quotation?
Send the application, required capacity, materials or operating conditions, utilities, destination country and port, site constraints, preferred options, project timing and installation expectations.
5. What should be checked before shipment?
The agreed configuration, safety equipment, dimensions, utilities, documentation, factory acceptance scope, packing, spare-parts list, installation responsibilities and destination requirements should be recorded before release.
6. Can this system operate reliably in extreme hot-climate conditions (Saudi Arabia, UAE, Iraq)?
Yes. IXORTA poultry systems are engineered with heavy-duty thermal insulation, oversized tunnel ventilation cone fans, evaporative cellulose cooling pads, and longitudinal manure drying air ducts to ensure full animal welfare in ambient temperatures exceeding 48°C.
7. What steel grades and hot-dip galvanization standards are used?
All structural uprights, tier frames, and floor mesh are fabricated from high-tensile steel hot-dip galvanized with 275 g/m² zinc coating conforming to ISO 1461, ensuring complete resistance against organic ammonia and sanitizing detergents for 15–20 years.
8. What is the typical factory manufacturing timeline and container packaging procedure?
Standard commercial configurations are manufactured and quality-verified within 4 to 6 weeks. Components are strapped, cushioned, moisture-barrier sealed, and loaded into 40ft High-Cube sea containers for secure international transit.
9. Does IXORTA provide on-site assembly supervision, commissioning, and farm staff training?
Yes. Factory mechanical and electrical installation supervisors are dispatched to customer project sites worldwide to oversee assembly, wire automation panels, commission drive units, and train farm personnel.
10. How are warranty terms, spare parts packages, and technical support managed?
Every installation includes a comprehensive 2-year consumable spare parts package and a 24-month manufacturer structural warranty. Emergency replacement parts are stocked in Konya and dispatched worldwide via express air courier within 48 hours.